step1.

初步接洽——需求及風(fēng)格定位探討—–了解預(yù)算
Initial contact——-Needs and style positioning Discussion—— Learn budget

step2.
簽訂設(shè)計(jì)合同
Sign the contract(Project prepayment)

step3.
平面草圖繪製——概念方案
Sketching plane—— The concept scheme

step4.
設(shè)計(jì)製作過程—–方案溝通及修改—-設(shè)計(jì)委託方確定最終設(shè)計(jì)方案
The Design of the production process—- Project Communication and modification — Design of client to determine the final design(second sum of money)

step5.
施工圖製作過程—–設(shè)計(jì)委託方確認(rèn)施工圖文件—-交接完整版設(shè)計(jì)文件(方案文件–效果圖–施工圖–物料表等)
Construction drawing production process — Principal confirm drawing documents —- Full version of the design file transfer(Program documents–Renderings–Working drawing–Material tables,etc)(Third sum of money)

step6.
施工跟進(jìn)—–施工問題指導(dǎo)及解決
Construction follow up — Construction guidance and solving problems( Pay the balance due)


step7.
項(xiàng)目完成—-專業(yè)攝影—-平臺推廣與宣傳
Project Completion — Professional Photography —Platform for promotion and publicity.

博仁設(shè)計(jì)


微信圖片_20201130104255